Construction Lookahead and Constraint Board

A three-week lookahead where every activity shows its open constraints: RFIs, submittals, crews, equipment and deliveries.

These images are illustrations of the concept, not screenshots of the actual product.

Overview

Construction Lookahead and Constraint Board is a PlanMagnet concept for construction and engineering teams that plan site work three weeks at a time. It gives project managers and superintendents a lookahead in which every activity appears as a bar on the calendar with its open constraints beside it, so the question for each task is not only when it happens but what still stands in its way.

On a construction project, activities rarely slip because nobody scheduled them. They slip because an RFI is still unanswered, a submittal has not been approved in time to hold a fabrication slot, a crew is not confirmed, a pump or crane is not booked, or material has not arrived. Those constraints are usually tracked in separate logs and pulled into a spreadsheet the night before the weekly subcontractor coordination meeting, and the lookahead is out of date by the time it is printed.

The illustrated page sits under Planning in the Projects area. A Three-Week Lookahead heading with a project selector and three week tabs sits above tiles counting activities, activities ready to start, open constraints and milestones at risk. The grid lists activities such as deck forming, rebar placement, embed plates, a deck pour, a drywall hang and a curtain wall with their dates and, for most, a trade contractor; the activities starting first carry a status of ready, constrained or at risk. Constraint chips sit under the bars: a crew from CrewFoundry, rebar on site from MoveTheWheels, an RFI open for several days, a pump from AssetHandler, a wait on the embed plates, framing progress, a level not yet dried in, a submittal approval deadline tied to a fabrication slot and crane slots. On the right, an At-risk sweep labeled AI-assisted shows when it last ran and notes that flags are suggestions with a stated reason. Its card explains why a building dry-in milestone is at risk, citing the pending submittal, the open RFI and the days of float left, and offers Raise as risk and a link to open the RFI.

The concept carries PlanMagnet's milestones and at-risk sweeps onto the job site, and it is designed to draw on other Burdenoff products. RFIs, submittals and inspections are designed to be entered by the project team, while crew readiness is designed to come from CrewFoundry, equipment from AssetHandler and material deliveries from MoveTheWheels. The sweep is designed to run daily and only proposes; a person decides whether a flag becomes a risk. The result is designed to give the weekly coordination meeting one shared view. Contractors, activities and dates shown are sample data.

What this concept shows

  • A three-week lookahead grid with week tabs and a project selector
  • Tiles counting activities, ready activities, open constraints and milestones at risk
  • Activity rows with dates, the trade contractor where one is assigned, and a ready, constrained or at-risk status on the nearest work
  • Constraint chips for RFIs, submittals, crews, equipment, deliveries, predecessor work and site conditions
  • Chips that name their source, such as a crew from CrewFoundry, a pump from AssetHandler and rebar on site from MoveTheWheels
  • An at-risk sweep, labeled AI-assisted, that shows when it last ran and notes that flags are suggestions with a stated reason
  • A milestone card that explains the risk in plain language, with Raise as risk and Open RFI actions

How it works

  1. Open Planning under Projects, choose the project and select the week to plan from.
  2. Read the tiles for activities, ready work, open constraints and milestones at risk.
  3. Scan each activity's bar and the constraint chips beneath it to see what is in place and what is still open.
  4. Read the at-risk sweep's card to see which milestone is threatened and why.
  5. Open the RFI or other blocking item, then decide whether to raise the flag as a risk.
  6. Walk the weekly subcontractor coordination meeting through the same board.

Who it's for

  • Construction project managers
  • Superintendents
  • Project engineers
  • Trade contractor foremen
  • Construction schedulers

Illustrations

1 illustration of this concept. Select one to view it full size.

Three-Week Lookahead with Constraints and Sweep

Each activity's bar carries its open constraints, and a sweep explains which milestone is at risk.

This illustration shows the Three-Week Lookahead page under Planning in the PlanMagnet Projects area. A project selector and tabs for three consecutive weeks sit beside the heading, above four tiles for activities, ready activities, open constraints and milestones at risk. The grid lists activities with their dates, most with a trade contractor and the first four with a ready, constrained or at-risk badge, against the working days of the three weeks. Constraint chips sit below the bars: green chips for a crew from CrewFoundry, rebar on site from MoveTheWheels and a pump from AssetHandler, a red chip for an RFI open for several days, and amber chips for a wait on another activity, framing progress, a level not yet dried in, a submittal deadline and crane slots. The At-risk sweep panel, labeled AI-assisted, shows the time it ran today and a note that flags are suggestions with a stated reason. Its card explains the risk to a building dry-in milestone and offers Raise as risk and Open RFI.

Topics

  • three-week lookahead schedule
  • construction lookahead planning
  • construction constraint management
  • RFI and submittal tracking
  • construction schedule risk
  • subcontractor coordination meeting
  • construction milestone at risk
  • short-interval planning
  • site constraint log
  • lookahead schedule software